HomeElectronicsRenewable EnergyTata Power Secures 210 MW Solar EPC Work in the Indian State...

Tata Power Secures 210 MW Solar EPC Work in the Indian State of Gujarat

Tata Power today announced its arm Tata Power Solar has received a Letter of Award (LoA) to build 210 MWp of solar capacity for state-owned power producer NTPC. The project’s total order value is approximately ÌNR 686 crore (US$ 94 million). 

The project shall be located in the Indian state of Gujarat. Commissioning is scheduled for November 2022.

With this addition, Tata Power Solar has a pipeline of around 2.8 GW projects with an approximate value of INR 13,000 crore (US$ 1783 million).

Tata Power’s work scope includes land, transmission, engineering, procurement, installation, and commissioning of the solar plant.

Tata Power Solar has a successful background in executing large projects. Some of these projects include 100 MW at Ananthapur, Andhra Pradesh; 50 MW at Kasargod, Kerala; and 30 MWp in Lapanga, Odisha. It also has a 105MWp of floating solar under implementation at Kayamkulam, Kerala.

ELE Times Research Desk
ELE Times Research Deskhttps://www.eletimes.ai
ELE Times provides extensive global coverage of Electronics, Technology and the Market. In addition to providing in-depth articles, ELE Times attracts the industry’s largest, qualified and highly engaged audiences, who appreciate our timely, relevant content and popular formats. ELE Times helps you build experience, drive traffic, communicate your contributions to the right audience, generate leads and market your products favourably.

Related News

Must Read

35 Years of Innovation from Jena: GÖPEL electronic Celebrates Its Anniversary

From a Jena-based spin-off to a globally sought-after test...

Applied Materials Announces Broadcom as EPIC Innovation Partner

Companies to collaborate on R&D to accelerate the introduction...

Gartner Forecasts Worldwide AI Spending to Grow 47% in 2026

$2.59 Trillion in AI Spending Excels by Vendors and...

Infineon CoolGaN BDS Chips Splash Portable Power Footprint by 82%

Infineon Technologies AG expands its CoolGaN BDS 40 V...

DEFTECH Bharat 2026 Concludes Successfully, Sets Stage for Expanded 2027 Edition at BIEC

DefTech Bharat successfully concluded its 2026 edition in Bengaluru,...

Keysight Enables End-to-End Electrical-Optical-Electrical Simulation for Data Center and Ethernet Design

Keysight Technologies today introduces an Electrical-Optical-Electrical (EOE) simulation solution...