HomeNewsIndia NewsMercom Capital: India tendered 1.7 GW of solar capacity in December

    Mercom Capital: India tendered 1.7 GW of solar capacity in December

    Analysts report data reveals a total of 1,776 MW of new solar capacity tendered in the month of December, 2016, with the Solar Energy Corporation of India accountable for more than 1 GW.

    India continues to shine bright even at the last month of the year, 2016, by tendering more than 1.7 GW of new solar capacity, as reported by market analysts Mercom Capital Group.

    The lion’s share of the new solar capacity goes to the credit of Solar Energy Corporation of India (SECI), the government’s authorized solar division that has been the driving force behind a push to build 1 GW of rooftop solar PV atop government buildings nationwide.

    Along with SECI’s 1 GW worth of tenders, Neyveli Lignite Corporation (NLC) also issued two solar tenders in December for 500 MW and 250 MW, to be set up in Tamil Nadu and Odisha respectively. The remaining capacity offered came from Hindustan Aeronautics Limited (HAL) for 15 MW to be built at the HAL Ojhar Township in Nasik, and 10 MW from Rajasthan Electronics and Instruments on behalf of the Oil and Natural Gas Corporation (ONGC) for a project in Gujarat.

    Mercom Capital reported that the 1,776 MW of tendered solar capacity in December was more than double the 755 MW tendered in November.

    With 2016 ending bright, India’s solar market awaits in optimistic anticipation for 2017. As a positive beginning, announcement came on January 1 that the Tamil Nadu Electricity Regulatory Commission (TNERC) has permitted the Tamil Nadu Generation and Distribution Corporation (TANGEDCO) to issue a further 500 MW tender for solar through competitive bidding.

    An earlier TANGEDCO tender issued late in 2016 was met with a lukewarm response by developers due to mounting problems in the state concerning late payments and curtailment. TANGEDCO is hopeful that this latest tender can prove more attractive, with reports in the local media suggesting that the utility has sought a procurement price of INR 4.50/kWh ($0.07/kWh).

    ELE Times Bureau
    ELE Times Bureauhttps://www.eletimes.ai/
    ELE Times provides a comprehensive global coverage of Electronics, Technology and the Market. In addition to providing in depth articles, ELE Times attracts the industry’s largest, qualified and highly engaged audiences, who appreciate our timely, relevant content and popular formats. ELE Times helps you build awareness, drive traffic, communicate your offerings to right audience, generate leads and sell your products better.

    LEAVE A REPLY

    Please enter your comment!
    Please enter your name here

    Related News

    Must Read

    Kyocera and Rohde & Schwarz’s multipurpose phased array antenna module (PAAM) at CES 2026

    Kyocera and Rohde & Schwarz will demonstrate the characterization...

    AI PCs: What Tata Electronics and Intel Aim to Scale in India

    Tata Electronics, a global enterprise headquartered in India, and...

    UP’s Semiconductor Push: State to Build Three New Electronics Hubs Beyond NCR

    With an aim to boost development and employment beyond...

    One Nation, One Compute Grid: India’s Leap into the AI and Supercomputing Era

    Courtesy: Dr. Harilal Bhaskar, Chief Operating Officer (COO) and...

    New, Imaginative AI-enabled satellite applications through Spacechips

    As the demand for smaller satellites with sophisticated computational...

    Beyond the Bill: How AI-Enabled Smart Meters Are Driving Lead Time Optimization and Supply Chain Resilience in the Energy Grid

    Introduction Smart meters have significantly evolved since their initial implementation...

    Inside the Digital Twin: How AI is Building Virtual Fabs to Prevent Trillion-Dollar Mistakes

    Introduction Semiconductor manufacturing often feels like modern alchemy: billions of...